In construction sites, infrastructure and superstructure activities, loading and unloading works, auto recovery and towing works, lifting and transportation works, scrap dumping, etc. High-tonnage lifting cranes, which are used for different purposes in the works, were remotely monitored with the help of the 24-hour scada system, and malfunction tracking and management were carried out. In addition, working times were determined and productivity was measured.